Renovating a Duplex - Part One: BEFORE

10/18/2014

0 Comments

 
This past year (and a half?) my fiance and I took on a huge project. I'm not even sure if I can call it a project at this point but rather a compilation of projects. First off, we bought a house. It was foreclosed and vacant for two years. The house was in a perfect location for us: close to bars and restaurants in a thriving urban/suburban neighborhood close to Cleveland. The neighborhood was very walkable, the people were friendly, the housing stock was great, and the streets were narrow and full of canopy trees. We loved the location of the house: it was near Detroit Ave., the main corridor running through downtown Lakewood and it was close to the Metroparks. It also featured a spacious third level that we could use for a master bedroom and walk-in closet. 

Though the back yard was small (like homes in Lakewood), it did have a detached garage and a decent size basement with two storage units.

Here are some before pictures of the initial walk-thru of the home:
After we knew for sure that we wanted the home, we had to go through the long and tedious process of closing on the house through a Fannie Mae 203b Renovation Mortgage. This allowed us to basically renovate the home and finance the payment to the contractor into our mortgage. Fannie Mae introduced this concept as a way for homebuyers to fix up foreclosed or run-down properties that were in need of repair. We were able to do a streamline 203b mortgage which allowed us to fast track the payment process to the contractor. 

Through this program, we had to hire a licensed and insured contractor to complete a substantial renovation within six months of our closing date. After which, the broker will inspect the home to make sure the work was completed as outlined in the original proposal from the contractor. Once the work is approved, final payment is issued to the homeowner who then forwards to the contractor.

Overall, the entire process--from the day we begin looking at homes until the day we finally completed the renovation and inspection with our contractor, took approximately one year. It was a huge weight off our shoulders when it was complete! 
0 Comments

    AUTHOR

    Brandon E. Young
    Cleveland-Based Architect and Designer

    Picture

    ARCHIVES

    February 2021
    January 2021
    October 2020
    September 2020
    August 2020
    May 2020
    October 2018
    May 2018
    October 2016
    September 2015
    November 2014
    October 2014
    September 2014
    March 2013
    February 2013
    January 2013
    October 2012
    August 2012
    July 2012
    June 2012
    May 2012
    April 2012
    March 2012
    December 2011
    November 2011
    October 2011
    September 2011
    August 2011

    CATEGORIES

    All
    Allan Jacobs
    Americas Cup
    Aqua Tower
    Arthur Wright
    Artspace
    Auckland
    Ayn Rand
    Brasilia Plan
    Broadacre City
    Camillo Sitte
    Chicago
    City Life
    City Of Bits
    Cleveland
    Cleveland Casino
    Cleveland Design Competition
    Collar Ties
    Combinatory Urbanism
    Concrete And Clay
    Concrete Vs Asphalt
    Conflict
    Constructed Wetlands
    Creative Class
    CUDC Welcoming + Orientation Guide
    Cuyahoga River
    Deconstruction
    Detroit Shoreway
    Detroit Superior Bridge
    Detroit-superior Bridge
    Doan Brook Watershed
    Dpz Architects
    Dugway Creek Watershed
    Earth Works
    Ecology
    Economic Growth
    Economy
    Elizabeth Hawkes
    Euclid Corridor
    Flats East Bank
    Fountainhead
    Frank Lloyd Wright
    High Speed Rail
    Home Renovation
    Ibm Building
    Jane Jacobs
    Joseph Rykwert
    Kevin Lynch
    La
    Lafayette Park
    Lakewood
    Land Cover
    Land Use
    Lane Barden
    Las Vegas
    Las Vegas After Its Classical Age
    Le Corbusier
    Led
    Lineposters
    London
    Market Ecology
    Medical Mart And Convention Center
    Mies Van Der Rohe
    Monument
    Narrative
    Nature Center At Shaker Lakes
    Neal Bascomb
    New Orleans
    Nine Mile Creek
    Oak Park
    Ohio Epa
    Olympic Park
    Open Spaces
    Origami Tessellations
    Publications
    Qulaity Of Place
    Radiant City
    Residential
    Richard Florida
    Richard Sennett
    Rustbelt
    Rustbelt Chic
    Shrinking Cities
    Site Visit
    Soho Effect
    Stormwater Impact
    Stormwater Management
    Streetsboro
    Studio
    Studio Gang
    Sub Urban
    Succession
    Sustainability
    Swales
    Symbolic Culture
    Symbolic Infrastructure
    Symbolic Monument
    The City Of Towers
    The Conscience Of The Eye
    The Death And Life Of Great American Cities
    The Detroit Shoreway
    The Economy Of Cities
    The Fountainhead
    The Idea Of A Town
    The Image Of The City
    The Junction
    The Life Of An Architecture Student
    The Neutral City
    The New Las Vegas
    The Parallels
    The Rise Of The Creative Class
    The Three T's Of Economic Growth
    Third Floor Renovation
    Tiny House
    Transect Design
    Treatment Approach
    Uli Competition
    Urban Bean Coffee House
    Urban Design
    Urban Systems
    Vacancy
    Water
    West Creek Watershed
    Wetland Park
    William Mitchell
    Witold Rybczynski

  • Blog
  • About
  • Portfolio
  • Graphic Design
  • Contact